Use separately or integrated in production line.
Used for pipe-flange welding.
Suit for 4 torch welding process.
Easy operation, the unskilled worker can operate with simple training.
Highest welding efficiency, lowest skill requirement.
The welding equipment were installed in moveable container, suit for small and short time proiect.
Configuration: Pipe welding station + pipe conveyer line + Pipe supporter + special container.
Productivity: high (can do small prefabrication line onsite).
Onsite installation performance: good (main equipment are installed in container. conveyer line install onsite).
Suit tor small and short time project.