The equipment were installed in moveable container, suit for small and short time project.
Configuration : Pipe cutting and beveling station 4 + simply conveyer system + container.
Productivity : high (can do small pretabrication line onsite).
Onsite installation performance: good (main equipment are installed in container, conveyer line install onsite).
Suit for small and short time project.